JP “Gas-Ruma” made an investment in the industrial zone “Rumska Petlja” to expand its capacity, and for this purpose a new metering and regulation station and the new gas distribution pipeline were built.
For the stated needs, Energo-Sistem d.o.o. has performed:
– manufacturing, delivery, assembly and commissioning of a two-line measuring and regulating station with a capacity of Q=8000 m3/h Pul=6-12 bar Piz=3-6 bar,
– complete mechanical works on the connecting inlet gas pipeline with a pipe diameter of 168.3 mm (30 meters) and the outlet steel gas pipeline with a diameter of 219.1 mm (15 meters),
– electrical works and
– execution of mechanical works on the construction of the distribution gas pipeline Rumska petlja 2 from PE pipes in a length of 1450 meters.